Black tarmac double drive
A tired concrete frontage broken out and rebuilt in black asphalt, with block kerbs on both sides and a gentle fall to a border.
- Area:
- about 40 m²
- Edging:
- Block kerbs
Call us on0333 015 9216

A tarmac driveway is hot asphalt spread in two layers over compacted crushed stone, then rolled firm between kerbs. We excavate, build the base and surface tarmac driveways for homes across Great Britain.
Send us photos of the existing drive and the road outside, and we can give a price once we have measured up on site.
Get a free quoteA tarmac driveway is a seamless drive of asphalt, crushed stone coated in hot bitumen, laid in two courses over a compacted stone base and rolled. It is the cheapest hard surface we lay and the quickest to finish, so it suits long approaches and frontages needed back in use fast.
We dig out enough for 150 to 200 mm of crushed stone, going deeper on clay or soft ground, and lay a membrane first. The stone and the binder course carry the weight together, so a thin or loose base shows within a few winters as cracks and potholes.
Tarmac strictly means tar-bound macadam, but modern drives use asphalt bound with bitumen, and the old name stuck. Unlike block paving, it forms one continuous layer that flexes slightly as a whole and sheds rain across its surface unless a porous mix is used.
Kerbs or edging blocks set in concrete run along every open side, giving the asphalt something firm to be rolled tight against. Without them the edges stay loose, crumble under tyres and let water into the base.
Two layers of asphalt make up the surface: a thicker binder course of coarse stone, then a thinner surface course of finer stone for a closed finish. Each is compacted with a heavy roller while still hot, and the joins at kerbs and manhole covers are sealed so water cannot creep beneath.
Your quote names the depth of each course and whether we overlay or dig out fully, so you know exactly what is being built.
A tarmac driveway comes in four main finishes, standard black, red, porous asphalt and surface dressing, which differ in look, drainage and price. The finish decides how the drive sits against the house, where the rain goes and what each square metre costs.
Standard black suits most homes and costs least, while porous asphalt suits front gardens with no lawn or border to drain onto. Surface dressing suits long rural drives meant to look like gravel, and red tarmac suits a drive that should read as separate from the pavement.
Black is by far the most common and the cheapest, and it hides tyre marks well. Red and buff mixes cost more and show scuffs sooner, and a contrast block border frames either colour against a lawn or the house.
Ask to see samples of each finish at the survey, because red and chipped surfaces look different beside real brickwork than on a screen.
A tarmac driveway is typically £45 to £90 per m² supplied and laid, so a double drive covering about 40 m² comes to around £1,800 to £3,600. Every row assumes black asphalt on a new stone base; red mixes, porous asphalt and long runs of kerbing push a price towards the top.
| Drive | Area | Price range |
|---|---|---|
| Single drive | about 20 m² | £900 to £1,800 |
| Double drive | about 40 m² | £1,800 to £3,600 |
| Large drive | about 80 m² | £3,600 to £7,200 |
Typical ranges for black tarmac supplied and laid; we price your own drive once the survey is done.
Area and dig-out matter most, with old concrete or blocks broken out at about £15 to £35 per m². A small drive works out dearer by the square metre: the roller, the crew and the minimum load of hot asphalt cost much the same on any job. The driveway cost guide explains the rest.
Your quote states the dig-out depth, the membrane and sub-base, and the thickness of the binder and surface courses, along with the kerbs and the colour. It also says whether we overlay or fully excavate, while channel drains and anything found underground are listed separately.
The survey turns these ranges into your price, once we know how deep the dig goes, what the old surface hides and how a lorry reaches the plot.
A tarmac driveway is quick to lay, carries cars and vans well and is the cheapest hard surface we build.
Once the base is in, asphalt is spread by machine and rolled within hours, so tarmac spends less time unusable than blocks or imprinted concrete. Its bitumen binder gives slightly under load rather than cracking, which is why it handles vans and turning cars well.
Next to block paving, tarmac is cheaper and faster to lay but offers little pattern. It costs more than gravel and has no loose stones to rake back, while resin bound stone costs more again and drains through where standard tarmac does not.
Its limits are a plain look and a surface that stays soft in its first summer, and block paving offers more pattern where looks come first.
In England, usually only if a solid tarmac driveway covers more than 5 m² of front garden and drains onto the road. Porous asphalt, or tarmac falling to a lawn or border, needs no application.
In England, the rule applies whether the tarmac is new or replaces an older surface. Scotland and Wales have rules of their own, which the drive follows.
| Situation | What applies |
|---|---|
| Porous surface, any size | Usually permitted development |
| Rain runs to a lawn or border | Usually permitted development |
| Solid surface over 5 m², draining off | Planning permission needed |
| New or wider dropped kerb | Council highways consent |
These rows describe an English house; at the survey we say which of them affect your drive.
Under England's front garden rule, standard tarmac counts as solid, so over 5 m² of it before a house must drain to a lawn or border or be porous. The allowance does not extend to flats or maisonettes, and a listed building or new access onto a classified road needs the council's say.
A drive entered over a full-height kerb needs a crossing approved by the council's highways team, which is separate from planning. The council charges £100 to £500 to apply, a finished crossing costs about £1,000 to £2,500, and a decision takes 6 to 12 weeks. We shape the mouth of the tarmac to meet whatever crossing is allowed.
We set the falls and any channel before the asphalt arrives, so rainwater stays within your boundary, and we raise any dropped kerb or application at the survey.
A tarmac driveway goes down in five stages, usually over 1 to 3 days on site for a double drive. The surface itself is the quick part, because the asphalt arrives hot and has to be spread and rolled before it cools.
The drive must fall away from the house so rain never pools at the walls, with its finished surface below the damp-proof course and airbricks. We shape the falls in the sub-base and again in the binder course, and roll each layer so no shallow hollows are left to hold puddles.
Solid tarmac sends rain across its surface, so each drive needs a planned outlet. We fall it to a lawn or planted border where we can, or fit a channel drain at the garage or house feeding a soakaway. Inspection covers are reset to the finished height.
You cannot drive on it from the dig-out until the surface course has cooled, a shorter spell than any other hard surface needs. Expect a skip or grab lorry and an asphalt delivery on the road, and a skip on the highway needs a council permit.
Your quote shows every stage and its depth, and anything buried under the old surface is costed as soon as it is uncovered.
A new tarmac driveway stays soft for its first months, so it needs gentle use in hot weather before it settles into a low-upkeep surface. After that first summer, an occasional sweep and a look along the edges and at any fine cracks keep it in good order.
Weeds seldom push through sound tarmac and appear mainly along the edges or in cracks where dirt collects. A regular sweep and a rinse keep it tidy, and a weed rooted at a kerb line is easier to pull before it widens the gap.
On a well-built base, tarmac carries cars and vans comfortably, though skip lorries and laden trucks can rut it in summer. Frost does its damage once water gets into a crack, freezing and widening it into a pothole, which a driveway repair cuts out and fills.
Fresh asphalt keeps some softness for its first months, and hot sun softens it further. Turning the steering while the car stands still scuffs it, and jacks, bike stands and skip feet press dents. Petrol, diesel or oil dissolves the bitumen, so spills need soaking up quickly.
Before we leave, we explain the first summer on the drive, from where to park and how to turn to what to do about a spill.
The tarmac driveways we lay are mostly black double drives for family cars, with long country lanes and coloured designs the next most common. Every card here is a kind of tarmac job we see often rather than one customer's property, with the area and edging typical of it.
A tired concrete frontage broken out and rebuilt in black asphalt, with block kerbs on both sides and a gentle fall to a border.
A track to a farmhouse surfaced with chippings rolled in, keeping a gravel look without stones scattering onto the lawn.
Red asphalt framed by a charcoal block border, with a channel drain across the garage door feeding a soakaway.
A small front garden turned into parking for one car in open-textured asphalt, so rain soaks away with no channel needed.
Whatever the finish, the depth of stone beneath decides how a tarmac drive wears, so it is the line on any quote most worth comparing.
We take on tarmac driveways for houses all over Great Britain, on narrow town plots and long rural approaches alike. Ground conditions shift from one area to the next, from slow-draining clay to chalk and sand that soak water away. The base and drainage we design follow what the survey finds beneath your drive.
Typically 12 to 20 years, depending on how well the base was built, how water leaves the drive and how soon cracks are dealt with. Black tarmac fades to grey well before then, which is wear on the surface rather than a sign of failure.
The quote for a tarmac driveway names what any guarantee covers, which usually turns on the state of the base and whether the drive is overlaid or dug out. Ask us to go through its terms, and any supplier terms on the asphalt, before you book.
Yes, if the old tarmac is firm, its base sound and the new level stays below the door thresholds and damp-proof course. Potholes are cut out and filled first, and over old concrete the slab joints tend to crack through. A drive that has sunk or broken up is dug out and rebuilt.
Usually once the surface course has cooled, often on the day it is laid. For its first summer, park in slightly different spots on hot days, so the tyres do not keep pressing the same patch.
Standard tarmac is not, because its closed texture sends rain across the top. Porous asphalt leaves open gaps between the stones over a free-draining base, so water drains into the ground below; otherwise the drive falls to a lawn, border or channel.
Expect noise, a lorry and the smell of hot asphalt for a short spell, so it helps to tell the neighbours before work starts. Where a drive is shared or meets a boundary, both owners need to agree the line of the new surface.
Not when new, because fresh asphalt is already dense and black. An older drive that has faded and turned open can be revived with a sealer or a dressing, which also gives some protection from fuel and water.
A quote for a tarmac driveway begins with photos of the drive and a visit to measure it and check the levels. Call us or use the form to tell us about the job, and we'll arrange a visit.
Let us know roughly how many cars it must take, what surface is there now and whether the kerb outside is already dropped.