Double drive in blocks
A front garden dug out for two cars, laid in herringbone with a darker border. More on block paving driveways.
- Area:
- about 40 m²
- Surface:
- Concrete block paving
Call us on0333 015 9216

A driveway is hard standing for cars, built in layers: dug-out ground, a compacted stone base, then the surface you see. We build new driveways in block paving, resin bound stone, tarmac, imprinted concrete and gravel, and repair worn ones, for houses all over Great Britain.
Send a photo of the front of your house and the number of cars it should take, and we'll arrange your quote.
Get a free quoteA driveway is a layered structure, with a compacted stone sub-base doing the real work and a surface on top that you see and drive on. The base spreads each wheel's weight into the ground, so a thin one sinks whatever finish covers it.
Below the stone sits a membrane that stops soil mixing in, and above it a laying course beds the surface level. Edging on every open side keeps the whole build from spreading outwards.
| Layer | What it does |
|---|---|
| Dug-out ground | Makes room for the base |
| Membrane | Keeps soil out of the stone |
| Compacted sub-base | Carries the weight of cars |
| Laying course | Beds the surface level |
| Surface | The finish you see and drive on |
| Edging | Stops the edges spreading |
Loose gravel and poured concrete go straight onto the sub-base; the other surfaces sit on a laying course.
Two drives can look the same on the day they are finished and age very differently. The base decides it, and for cars that means 150 to 200 mm of crushed stone, compacted in thin layers.
We build driveways in five surfaces and repair existing ones, each from the base up rather than by laying a new top on tired ground. The surfaces differ in price, in how they deal with rain and in how much looking after they need.
Two choices drive most enquiries. Block paving gives the widest choice of pattern, while resin bound stone is smooth and lets rain soak through. Where the base is still sound, a repair may be enough.
Repairs cover sunken blocks, potholes in tarmac, cracked concrete and gravel that has thinned or spread. On an older driveway a patch can show at first, until the new surface weathers to match.
A new double driveway typically costs £2,000 to £6,000, from tarmac or gravel at the lower end to block paving and resin bound stone at the top. By area, prices run from £30 to £70 per m² for gravel to £75 to £150 per m² for block paving.
The surface is only part of it. Digging out, taking away the spoil and building the sub-base cost much the same whichever finish goes on top, so the cheapest surface does not always make the cheapest drive.
| Surface | Price per m² | Double drive, about 40 m² |
|---|---|---|
| Gravel | £30 to £70 per m² | £1,200 to £2,800 |
| Tarmac | £45 to £90 per m² | £1,800 to £3,600 |
| Imprinted concrete | £75 to £120 per m² | £3,000 to £4,800 |
| Block paving | £75 to £150 per m² | £3,000 to £6,000 |
| Resin bound | £65 to £130 per m² | £2,600 to £5,200 |
Typical supplied-and-laid ranges; the exact cost for your drive comes with our quote.
Breaking out an old surface, drainage, steps and a dropped kerb are the costs most often missed, and the driveway cost guide covers each one.
Taking up old tarmac or concrete adds about £15 to £35 per m². A dropped kerb is a separate council matter, typically £1,000 to £2,500 for the whole crossing. Where most of the base is sound, driveway repairs cost a fraction of a new drive.
The best driveway surface is the one that suits your budget, the slope of the ground and the amount of upkeep you are willing to do. The commonest mistake is choosing a surface from a photograph.
A finish that looks right on a flat, sheltered plot can rut on a slope or stain under trees. We look at levels, drainage and how the drive will be used before suggesting anything.
Each surface trades price against upkeep and drainage in its own way. The resin and block paving comparison sets the two most popular side by side.
In England, a driveway usually needs no planning permission if it is porous or drains to a lawn or border. A solid front driveway over 5 m² that sends rain onto the road needs permission. The front garden rule covers new and replacement surfaces between the house and the road.
Gravel, resin bound stone, permeable blocks and porous asphalt all meet it as they are. Solid block paving, tarmac and concrete meet it through falls that send water to a planted area or a soakaway. Scottish and Welsh rules differ.
| Situation | What applies |
|---|---|
| Porous surface, any size | Usually permitted development |
| Rain runs to a lawn or border | Usually permitted development |
| Solid surface over 5 m², draining off | Planning permission needed |
| New or wider dropped kerb | Council highways consent |
| New access onto a classified road | Planning permission needed |
| Flat or maisonette | Usually needs permission |
| Listed building or conservation area | Check with the council |
The rules for a house in England; we confirm the rows that affect your plot before quoting.
A dropped kerb, which councils often call a vehicle crossover, is a separate consent from the highway authority, and its decision alone can take 6 to 12 weeks. The dropped kerb guide explains what councils look for.
A new driveway from us covers everything from digging out the old ground to the final sweep, with no layer left for someone else. Groundwork takes the most time and carries most of the cost.
We break out the old surface, take the spoil away and check for pipes, cables and old footings before any stone goes down. The sub-base is laid and compacted in layers, never in one thick pass.
Your quote lists each part for your drive. Drainage, steps, walls and anything found below ground, such as an old soakaway, are priced as separate lines.
A new driveway replaces everything down to the ground, resurfacing puts a new top on a sound base, and a repair fixes the damaged part alone. The state of the base, not the surface, decides which of the three makes sense.
Resurfacing suits a drive that is level and firm but faded or crumbling on top. Replacing a solid surface brings the front garden rule into play, so a resurface in tarmac or concrete may need drainage added.
| Factor | New driveway | Resurfacing | Repair |
|---|---|---|---|
| Relative cost | £££ | ££ | £ |
| Suits | Failed or sunken base | Sound base, tired top | Damage in one area |
| New sub-base | Yes | No | Only where dug out |
| Drainage rules | Apply | Can apply | Rarely |
| Changes the look | Completely | Mostly | Very little |
A general comparison. Which one your drive needs is clear once we have looked at the base.
If only one corner has sunk or a few potholes have opened, we will say so, because a repair costs far less than a new drive. Ruts and dips across the whole area are another matter.
Building a driveway takes five stages, with a double drive typically on site for 1 to 6 days, depending on the surface. Digging out and building the base take the longest, so the surface goes down near the end.
Gravel and tarmac are the quickest to finish, block paving the slowest, and concrete needs about a week before cars go on it. Heavy rain stops resin work, and frost stops concrete.
The quote sets out how many days we expect to be on site and what might add to them. We also agree where the skip will stand and where you can park while the drive is out of use.
A well-built driveway typically lasts 12 to 20 years in tarmac and 20 to 30 years in block paving or imprinted concrete, with gravel needing its base reworked soonest. Water shortens a drive's life more than traffic does, whether it sits in the base or freezes in open joints and cracks.
Full joints, sound sealer and clear channels keep it out. Concrete blocks can fade in strong sun, while clay pavers hold their colour longer at a higher price, and tarmac greys within its first few years.
| Surface | Look | Upkeep | Typical life |
|---|---|---|---|
| Block paving | Pattern of blocks, many colours | Sweep, re-sand joints | 20 to 30 years |
| Resin bound | Smooth, seamless stone | Sweep and rinse | 15 to 25 years |
| Tarmac | Plain black or red | Very little | 12 to 20 years |
| Imprinted concrete | Stone, brick or cobble pattern | Reseal every few years | 20 to 30 years |
| Gravel | Loose stone that crunches | Rake and top up | 10 to 15 years |
Typical lifespans with sensible upkeep, not promises; the base and drainage matter more than the surface.
Look at samples outside in daylight before you choose. Pale stone and buff blocks show oil drips, while very dark surfaces show dust and leaves.
Every driveway we lay comes with a written guarantee, described in the quote, and what it covers varies with the surface and the base. There are usually two sets of terms.
Ours cover the workmanship, from the sub-base to the finish. Makers of the blocks, resins and sealers set their own terms for those materials, and some apply only when their products are laid exactly to their instructions.
A driveway lasts longest when water drains off it and heavy vehicles stay off it. At handover we explain how to clean your surface and what to watch for in its first year.
A sound driveway that suits the house tends to help a sale, while a sunken or cracked one counts against it, and we won't put a figure on either. Buyers notice off-road parking first, then the condition of the drive and the kerb appeal it gives the house.
A surveyor may flag puddles by the walls or a drive laid too close to the damp-proof course. A solicitor may ask whether the dropped kerb was approved, so keep the council's paperwork with the deeds.
| Factor | Adds appeal | Adds little |
|---|---|---|
| Condition | Level, sound surface | Sunken or cracked surface |
| Parking | Room for two cars | A tight single space |
| Look | Suits the house and street | Out of keeping nearby |
| Water | Drains without puddles | Pools by the door |
| Paperwork | Approved dropped kerb | Crossing with no consent |
A general guide; any effect on price varies by house and street.
Off-road parking matters most on streets where kerbside spaces are scarce. That is a judgement for an estate agent, not for us.
Most driveways we build are one of four common jobs, shown here with the area and surface each usually has. These describe typical jobs, not customers' homes.
Area, ground conditions and buried surprises under the old surface differ from house to house, and we pin them down at the survey.
A front garden dug out for two cars, laid in herringbone with a darker border. More on block paving driveways.
A single drive on a new porous base, finished in a warm stone blend. More on resin bound driveways.
A new crossing to the road and a black tarmac drive falling to a channel and soakaway. More on tarmac driveways.
A long country drive in angular stone held in grids, with a hard apron at the gate. More on gravel driveways.
Every plot has its own levels, ground and access, so we price a drive only once we have seen where it will go.
We build and repair driveways all over England, Wales and Scotland, from town terraces to farmhouses. Ground and drainage vary more than the houses do.
Heavy clay in much of the south and the Midlands drains slowly, so porous drives there need a deeper base or an overflow. Chalk and sandy ground soak water away quickly, and steep streets in hill towns call for grids or bound surfaces.
Conservation areas and classified roads change what a drive needs, so we ask for your postcode first.
Fresh oil lifts best when soaked up at once with sawdust or cat litter, then scrubbed with warm soapy water. Older stains on blocks or concrete need a degreaser, but solvents soften tarmac, so we keep them off it.
A typical double drive takes 1 to 6 days on site. Gravel and tarmac are the quickest and block paving the slowest, while old concrete to break out or soft ground adds to it.
A driveway that lets rain soak through its surface into an open stone base and the ground beneath. Gravel, resin bound stone, permeable blocks and porous asphalt all work this way, as the permeable driveways guide explains.
Yes, if the drive meets the road across a pavement or verge with a raised kerb. Driving over a full-height kerb is not allowed, and the crossing needs your council's consent, with a fee of £100 to £500.
Gravel, at £30 to £70 per m², followed by tarmac at £45 to £90 per m². Both still need the same dug-out, compacted base as any other surface.
Most weeds grow from seeds landing in dirt on top, not from below. A membrane under the base, joints kept full and regular sweeping stop most of them, and the odd one is treated by hand.
Sometimes. Resin or tarmac can go over a sound, well-drained tarmac or concrete drive if raising the level still keeps it below the damp-proof course. A cracked or sunken base has to come out first.
Block paving and gravel can be laid in most dry winter weather. Concrete, tarmac and resin need milder, drier days to set properly, so we plan those around the forecast.
Pricing a drive means first seeing the ground, the levels and the way water runs across your front garden. Send an enquiry or call, and we'll arrange a time to measure up.
Photos of the front of the house and the road help, along with your postcode and the surface you have in mind. Mention any drains, trees or steps near the drive, and whether you need a new dropped kerb.