Wren Driveways

Call us on0333 015 9216

0333 015 9216

A newly laid driveway in front of a two-storey house, its edges crisp and the surface clean

Driveways laid and repaired throughout England, Scotland and Wales

A driveway is hard standing for cars, built in layers: dug-out ground, a compacted stone base, then the surface you see. We build new driveways in block paving, resin bound stone, tarmac, imprinted concrete and gravel, and repair worn ones, for houses all over Great Britain.

Send a photo of the front of your house and the number of cars it should take, and we'll arrange your quote.

Get a free quote

What is a driveway made of?

A driveway is a layered structure, with a compacted stone sub-base doing the real work and a surface on top that you see and drive on. The base spreads each wheel's weight into the ground, so a thin one sinks whatever finish covers it.

Below the stone sits a membrane that stops soil mixing in, and above it a laying course beds the surface level. Edging on every open side keeps the whole build from spreading outwards.

The layers of a driveway
LayerWhat it does
Dug-out groundMakes room for the base
MembraneKeeps soil out of the stone
Compacted sub-baseCarries the weight of cars
Laying courseBeds the surface level
SurfaceThe finish you see and drive on
EdgingStops the edges spreading

Loose gravel and poured concrete go straight onto the sub-base; the other surfaces sit on a laying course.

Two drives can look the same on the day they are finished and age very differently. The base decides it, and for cars that means 150 to 200 mm of crushed stone, compacted in thin layers.

Driveways we build and repair

We build driveways in five surfaces and repair existing ones, each from the base up rather than by laying a new top on tired ground. The surfaces differ in price, in how they deal with rain and in how much looking after they need.

Two choices drive most enquiries. Block paving gives the widest choice of pattern, while resin bound stone is smooth and lets rain soak through. Where the base is still sound, a repair may be enough.

  • Block Paving Driveways

    : Concrete or clay blocks laid in a pattern on a compacted base, edged and jointed, and easy to lift and relay later.
  • Resin Bound Driveways

    : Natural stone mixed with clear resin and trowelled smooth over a porous base, so rain drains straight through.
  • Tarmac Driveways

    : Hot asphalt laid in two courses over a crushed stone base and rolled firm, the quickest hard drive to lay.
  • Imprinted Concrete Driveways

    : Coloured concrete poured as one slab, stamped with a stone, brick or cobble pattern and sealed.
  • Gravel Driveways

    : Angular stone over a compacted, free-draining base, held in grids or edging so it stays put under the wheels.
  • Driveway Repairs

    : Sunken blocks relaid, potholes and cracks cut out and made good, and tired surfaces patched to match.

Repairs cover sunken blocks, potholes in tarmac, cracked concrete and gravel that has thinned or spread. On an older driveway a patch can show at first, until the new surface weathers to match.

How much does a new driveway cost?

A new double driveway typically costs £2,000 to £6,000, from tarmac or gravel at the lower end to block paving and resin bound stone at the top. By area, prices run from £30 to £70 per m² for gravel to £75 to £150 per m² for block paving.

The surface is only part of it. Digging out, taking away the spoil and building the sub-base cost much the same whichever finish goes on top, so the cheapest surface does not always make the cheapest drive.

Driveway prices by surface
SurfacePrice per m²Double drive, about 40 m²
Gravel£30 to £70 per m²£1,200 to £2,800
Tarmac£45 to £90 per m²£1,800 to £3,600
Imprinted concrete£75 to £120 per m²£3,000 to £4,800
Block paving£75 to £150 per m²£3,000 to £6,000
Resin bound£65 to £130 per m²£2,600 to £5,200

Typical supplied-and-laid ranges; the exact cost for your drive comes with our quote.

Breaking out an old surface, drainage, steps and a dropped kerb are the costs most often missed, and the driveway cost guide covers each one.

Taking up old tarmac or concrete adds about £15 to £35 per m². A dropped kerb is a separate council matter, typically £1,000 to £2,500 for the whole crossing. Where most of the base is sound, driveway repairs cost a fraction of a new drive.

Get a free quote

Which driveway surface is best for your home?

The best driveway surface is the one that suits your budget, the slope of the ground and the amount of upkeep you are willing to do. The commonest mistake is choosing a surface from a photograph.

A finish that looks right on a flat, sheltered plot can rut on a slope or stain under trees. We look at levels, drainage and how the drive will be used before suggesting anything.

  • Keeping costs down

    : Gravel costs least to lay and drains on its own. Tarmac is the cheapest hard surface and the quickest to finish.
  • Little upkeep

    : Resin bound stone needs only sweeping and the odd rinse. Tarmac needs even less once it has hardened in its first summer.
  • Heavy daily use

    : Block paving and imprinted concrete stand up well to several cars turning every day, on a base dug deep enough for them.
  • Slopes and awkward plots

    : Gravel in honeycomb grids or a bound surface copes with a slope better than loose stone, which washes downhill in heavy rain.

Each surface trades price against upkeep and drainage in its own way. The resin and block paving comparison sets the two most popular side by side.

Do you need planning permission for a driveway?

In England, a driveway usually needs no planning permission if it is porous or drains to a lawn or border. A solid front driveway over 5 m² that sends rain onto the road needs permission. The front garden rule covers new and replacement surfaces between the house and the road.

Gravel, resin bound stone, permeable blocks and porous asphalt all meet it as they are. Solid block paving, tarmac and concrete meet it through falls that send water to a planted area or a soakaway. Scottish and Welsh rules differ.

Driveway approvals in England
SituationWhat applies
Porous surface, any sizeUsually permitted development
Rain runs to a lawn or borderUsually permitted development
Solid surface over 5 m², draining offPlanning permission needed
New or wider dropped kerbCouncil highways consent
New access onto a classified roadPlanning permission needed
Flat or maisonetteUsually needs permission
Listed building or conservation areaCheck with the council

The rules for a house in England; we confirm the rows that affect your plot before quoting.

A dropped kerb, which councils often call a vehicle crossover, is a separate consent from the highway authority, and its decision alone can take 6 to 12 weeks. The dropped kerb guide explains what councils look for.

What's included in a new driveway

A new driveway from us covers everything from digging out the old ground to the final sweep, with no layer left for someone else. Groundwork takes the most time and carries most of the cost.

We break out the old surface, take the spoil away and check for pipes, cables and old footings before any stone goes down. The sub-base is laid and compacted in layers, never in one thick pass.

  • Old surface dug out and removed
  • Membrane and compacted sub-base
  • Edging fixed on every side
  • Levels set to shed water
  • Surface laid and finished
  • Waste cleared and drive swept

Your quote lists each part for your drive. Drainage, steps, walls and anything found below ground, such as an old soakaway, are priced as separate lines.

Replace, resurface or repair a driveway?

A new driveway replaces everything down to the ground, resurfacing puts a new top on a sound base, and a repair fixes the damaged part alone. The state of the base, not the surface, decides which of the three makes sense.

Resurfacing suits a drive that is level and firm but faded or crumbling on top. Replacing a solid surface brings the front garden rule into play, so a resurface in tarmac or concrete may need drainage added.

Driveway options compared
FactorNew drivewayResurfacingRepair
Relative cost££££££
SuitsFailed or sunken baseSound base, tired topDamage in one area
New sub-baseYesNoOnly where dug out
Drainage rulesApplyCan applyRarely
Changes the lookCompletelyMostlyVery little

A general comparison. Which one your drive needs is clear once we have looked at the base.

If only one corner has sunk or a few potholes have opened, we will say so, because a repair costs far less than a new drive. Ruts and dips across the whole area are another matter.

How we build a driveway

Building a driveway takes five stages, with a double drive typically on site for 1 to 6 days, depending on the surface. Digging out and building the base take the longest, so the surface goes down near the end.

Gravel and tarmac are the quickest to finish, block paving the slowest, and concrete needs about a week before cars go on it. Heavy rain stops resin work, and frost stops concrete.

  1. Survey and levels: We measure the area, take levels from the house and the road, check the ground and drains, and agree the shape and finish.
  2. Dig out: The old surface and soil are dug out to the depth the drive needs, and the spoil is taken away.
  3. Sub-base: A membrane goes down, then crushed stone, compacted in layers to 150 to 200 mm, with edging bedded on every open side.
  4. Lay the surface: The chosen surface is laid to the falls set out at the survey, with channels or a soakaway where the water needs them.
  5. Finish and clear: Joints are filled or the surface sealed where it needs it, the site is cleared and we walk the finished drive with you.

The quote sets out how many days we expect to be on site and what might add to them. We also agree where the skip will stand and where you can park while the drive is out of use.

How long does each driveway surface last?

A well-built driveway typically lasts 12 to 20 years in tarmac and 20 to 30 years in block paving or imprinted concrete, with gravel needing its base reworked soonest. Water shortens a drive's life more than traffic does, whether it sits in the base or freezes in open joints and cracks.

Full joints, sound sealer and clear channels keep it out. Concrete blocks can fade in strong sun, while clay pavers hold their colour longer at a higher price, and tarmac greys within its first few years.

Driveway surfaces compared
SurfaceLookUpkeepTypical life
Block pavingPattern of blocks, many coloursSweep, re-sand joints20 to 30 years
Resin boundSmooth, seamless stoneSweep and rinse15 to 25 years
TarmacPlain black or redVery little12 to 20 years
Imprinted concreteStone, brick or cobble patternReseal every few years20 to 30 years
GravelLoose stone that crunchesRake and top up10 to 15 years

Typical lifespans with sensible upkeep, not promises; the base and drainage matter more than the surface.

Look at samples outside in daylight before you choose. Pale stone and buff blocks show oil drips, while very dark surfaces show dust and leaves.

Driveway guarantees and aftercare

Every driveway we lay comes with a written guarantee, described in the quote, and what it covers varies with the surface and the base. There are usually two sets of terms.

Ours cover the workmanship, from the sub-base to the finish. Makers of the blocks, resins and sealers set their own terms for those materials, and some apply only when their products are laid exactly to their instructions.

A driveway lasts longest when water drains off it and heavy vehicles stay off it. At handover we explain how to clean your surface and what to watch for in its first year.

Does a new driveway add value to a house?

A sound driveway that suits the house tends to help a sale, while a sunken or cracked one counts against it, and we won't put a figure on either. Buyers notice off-road parking first, then the condition of the drive and the kerb appeal it gives the house.

A surveyor may flag puddles by the walls or a drive laid too close to the damp-proof course. A solicitor may ask whether the dropped kerb was approved, so keep the council's paperwork with the deeds.

What buyers notice
FactorAdds appealAdds little
ConditionLevel, sound surfaceSunken or cracked surface
ParkingRoom for two carsA tight single space
LookSuits the house and streetOut of keeping nearby
WaterDrains without puddlesPools by the door
PaperworkApproved dropped kerbCrossing with no consent

A general guide; any effect on price varies by house and street.

Off-road parking matters most on streets where kerbside spaces are scarce. That is a judgement for an estate agent, not for us.

Typical driveway projects

Most driveways we build are one of four common jobs, shown here with the area and surface each usually has. These describe typical jobs, not customers' homes.

Area, ground conditions and buried surprises under the old surface differ from house to house, and we pin them down at the survey.

  • Double drive in blocks

    A front garden dug out for two cars, laid in herringbone with a darker border. More on block paving driveways.

    Area:
    about 40 m²
    Surface:
    Concrete block paving
  • Single resin drive

    A single drive on a new porous base, finished in a warm stone blend. More on resin bound driveways.

    Area:
    about 20 m²
    Surface:
    Resin bound stone
  • Tarmac with dropped kerb

    A new crossing to the road and a black tarmac drive falling to a channel and soakaway. More on tarmac driveways.

    Area:
    about 40 m²
    Surface:
    Tarmac
  • Country gravel sweep

    A long country drive in angular stone held in grids, with a hard apron at the gate. More on gravel driveways.

    Area:
    about 80 m²
    Surface:
    Gravel in grids

Every plot has its own levels, ground and access, so we price a drive only once we have seen where it will go.

Areas we cover

We build and repair driveways all over England, Wales and Scotland, from town terraces to farmhouses. Ground and drainage vary more than the houses do.

Heavy clay in much of the south and the Midlands drains slowly, so porous drives there need a deeper base or an overflow. Chalk and sandy ground soak water away quickly, and steep streets in hill towns call for grids or bound surfaces.

  • Barking and Dagenham
  • Barnet
  • Bexley
  • Birmingham
  • Bradford
  • Brent
  • Brighton and Hove
  • Bristol
  • Bromley
  • Cardiff
  • Coventry
  • Croydon
  • Derby
  • Ealing
  • Edinburgh
  • Enfield
  • Glasgow
  • Greenwich
  • Hackney
  • Haringey
  • Harrow
  • Havering
  • Hillingdon
  • Hounslow
  • Islington
  • Kingston upon Hull
  • Lambeth
  • Leeds
  • Leicester
  • Lewisham
  • Liverpool
  • Luton
  • Manchester
  • Newcastle upon Tyne
  • Newham
  • Northampton
  • Nottingham
  • Plymouth
  • Portsmouth
  • Redbridge
  • Sheffield
  • Southampton
  • Southwark
  • Stoke-on-Trent
  • Tower Hamlets
  • Waltham Forest
  • Wandsworth
  • Wolverhampton

See all areas we cover

Conservation areas and classified roads change what a drive needs, so we ask for your postcode first.

Frequently asked questions

How do you get oil stains off a driveway?

Fresh oil lifts best when soaked up at once with sawdust or cat litter, then scrubbed with warm soapy water. Older stains on blocks or concrete need a degreaser, but solvents soften tarmac, so we keep them off it.

How long does it take to lay a driveway?

A typical double drive takes 1 to 6 days on site. Gravel and tarmac are the quickest and block paving the slowest, while old concrete to break out or soft ground adds to it.

What is a permeable driveway?

A driveway that lets rain soak through its surface into an open stone base and the ground beneath. Gravel, resin bound stone, permeable blocks and porous asphalt all work this way, as the permeable driveways guide explains.

Do you need a dropped kerb for a driveway?

Yes, if the drive meets the road across a pavement or verge with a raised kerb. Driving over a full-height kerb is not allowed, and the crossing needs your council's consent, with a fee of £100 to £500.

What is the cheapest driveway surface?

Gravel, at £30 to £70 per m², followed by tarmac at £45 to £90 per m². Both still need the same dug-out, compacted base as any other surface.

How do you stop weeds growing in a driveway?

Most weeds grow from seeds landing in dirt on top, not from below. A membrane under the base, joints kept full and regular sweeping stop most of them, and the odd one is treated by hand.

Can a new driveway be laid over the old one?

Sometimes. Resin or tarmac can go over a sound, well-drained tarmac or concrete drive if raising the level still keeps it below the damp-proof course. A cracked or sunken base has to come out first.

Can a driveway be laid in winter?

Block paving and gravel can be laid in most dry winter weather. Concrete, tarmac and resin need milder, drier days to set properly, so we plan those around the forecast.

Get a free quote

Pricing a drive means first seeing the ground, the levels and the way water runs across your front garden. Send an enquiry or call, and we'll arrange a time to measure up.

Photos of the front of the house and the road help, along with your postcode and the surface you have in mind. Mention any drains, trees or steps near the drive, and whether you need a new dropped kerb.

Get a free quote

Get a free quoteCall